Can concrete masonry be laid from inside of a building during construction of high-rise buildings?

From NCMA's eNews
June 14, 2018

Yes. Concrete masonry can often be laid from inside of the building. Laying concrete masonry from inside the building can be the most efficient and cost effective method, and also allows a mason to work on the building floor area. For more information on constructing high-rise concrete masonry buildings, see TEK 3-12 Construction of High-Rise Concrete Masonry Buildings.